Centralized Vacuum Plastic Granule Pellet Materials Automatic Loading System
A central Loading system designed for plastic injection workshop production to achieve uninterrupted continuous unmanned molding operation. According to the need to change the variety of raw materials, multi-color materials used in combination, to achieve automation of the coloring process.
Central Loading System Introduction:
- The central loading system is a set of plastic molding industry for large automated pre-processing and delivery of raw materials equipment.
- The system uses the transmission pipe, exhaust pipe, and valve storage tank, matching machine, desiccant dryer, Roots blower, dust collector, distribution station, online crusher, branch valve and other equipment connected A fully automation system.
- Can simultaneously achieve the drying of raw materials, transportation, ratio, color, plastic runner and recycling functions.
Central Loading System Works:
Central loading system is the realization of the centralized processing of raw materials, through the closed conveyor system, one-to-many automatic controller will be a variety of different raw materials in accordance with the demand sent to a molding machine to save energy and to reduce noise and pollution Of the best automatic system, for raw materials which have been dried in raw materials area, we will make dry air to transport in order to avoid re-damp raw materials, the advanced central controller plus The best tool of unique pulse dust collector design is to prevent the loading system blocking.
Central Feeding System Classification:
- One machine one pipe: A plastic injection machine corresponds to a raw material pipe.
- One machine double pipe: One injection molding machine corresponds to two raw materials pipelines.
- One machine one pipe plus the main material pipe: Part of an injection molding machine corresponds to a raw material pipe, part of a raw material pipe corresponds to supply multiple injection molding machine.
- The main material pipe: A raw material pipe corresponds to supply multiple injection molding machine.
Central Loading System Features:
- Achieve the whole plant unattended operation of loading, saving a lot of manpower.
- Equipped with cooling water circulation system, automatic removal of the conveyor system, hot and cold exchange system and secondary material recovery system to achieve unmanned factory operations. Energy saving can be transferred from lighting, air conditioning and other equipment.
- Greatly improve production efficiency and reduce production cost.
- Greatly improve product quality and reduce the non-performing rate.
- Can be adjusted according to the needs of different raw materials, eliminating the trouble of refueling.
- The pipeline layout does not occupy the ground space, saving effective workshop space.
- Neat and beautiful pipeline layout effectively improves the workshop environment.
- Relatively low cost, saving significant expenses in the long run.
- Achieve a closed pipeline transportation of raw materials to completely avoid workshop noise, dust, and hot air pollution.
Principal Diagram
Manufacturing Facility & Modernized Metal-Processing Workshop
All cabinet and metal plates are processed by our own sheet-metal workshop with first class quality control.
Project Cases in Plastic Injection Industry
Quality Certificates
Global Clients
Frequently Asked Questions (FAQ)
Q: What differentiates your manufacturing from other suppliers?
A: We own and operate our own sheet metal workshop, which cuts down external transaction costs and allows for superior, direct quality control. The cabinet units are structurally robust and built for long-term durability.
Q: What is the scale of your production facilities?
A: Our modern manufacturing base covers 12 acres of land, featuring a combined office and workshop space of 22,000 square meters. The operation is supported by a dedicated workforce of approximately 180 professional staff members.
Q: Which major reference customers use your equipment?
A: Our client portfolio includes top-tier companies globally, featuring brands like Toyota, Ford, and BYD in the automotive sector; Haier, TCL, and AUX in household appliances; and Siemens, Xerox, Foxconn, and Omron in electronics and electrical supplies.
Q: What is the standard lead time for delivery?
A: For standard configurations operating on 230V/50Hz/1Phase or 400V/50Hz/3Phase, delivery is approximately 15 to 30 working days. Other specific voltages may take 30 to 45 working days, while customized solutions require 40 to 50 working days.
Q: What is the standard port of loading?
A: Our standard port for sea freight shipments is Shenzhen, China.
Q: What warranty is included with the systems?
A: We provide a standard warranty of one year on all mechanical parts and three months on all consumable parts, starting from the date of the Bill of Lading (B/L).
Thank you for your time, We Appreciate Your Business.