Explosion Proof Wet Dust Collector Industrial Exhaust Purifier for Aluminum Powder Flour Coal Dust Processing

Product Description

Equipment Showcase 1 Equipment Showcase 2 Equipment System Overview
Control System
Control System
Internationally renowned brand,equipped with an independent electrical control box, featuring built-in thermal overload protection and phase loss protection to effectively mitigate equipment failure risks; supports multiple operation modes including local and remote control; and includes a new automatic fault alarm function for real-time feedback of equipment status.
Power System
Power System
Direct-drive installation structure reduces transmission losses. High speed, large air volume, and high static pressure meet the gas handling needs under different working conditions; operating noise ≤75dB, reducing interference with the workshop environment, and ensuring long-lasting and reliable dust removal efficiency.
Water Tank Design
Water Tank Design
The bottom is equipped with a combination of casters and fixed feet, balancing mobility and placement stability, allowing for quick adjustment of the equipment's position to adapt to different workshop layouts.
Machine Body Structure Design
Machine Body Structure Design
Made of high-strength carbon steel with a powder-coated surface (materials can be customized), it is corrosion-resistant, wear-resistant, suitable for harsh working conditions such as high temperatures and dust, and has a long service life. Integrated sealing design using leak-proof sealing technology.
Water Inlet System
Water Inlet System
Automatic control using a solenoid valve is employed. The water inlet pipe connects to the municipal water supply pipe via a φ12 pagoda connector, achieving intelligent and precise water level control.
Liquid Level System
Liquid Level System
Equipped with three liquid level electrodes (low, medium, and high), with a sensitivity ≤ ±1mm, it monitors the water level in the tank in real time and provides feedback signals. A new automatic low-liquid-level alarm function is added to ensure operational safety.
Sewage System
Sewage System
The sewage discharge tank is equipped with a liquid level observation window, allowing for direct monitoring of sediment accumulation and facilitating scheduled sewage discharge without frequent opening of the cover for inspection. The sewage discharge port uses a φ25 pagoda connector design for convenient connection.
Limit Switch
Limit Switch
A separate sewage discharge tank is standard, equipped with a limit switch. The equipment can only start operating when the sewage discharge tank reaches the limit switch; the sewage discharge process is simple and efficient.
Filtration System Diagram
Filtration System

The system adopts a two-stage purification structure of "impact dust collection + demisting and dehydration": the first stage captures large dust particles through water droplets and water curtains generated by airflow impacting water bodies; the second stage uses a demister to efficiently separate water vapor from the gas (demister efficiency ≥98%). It has a significant effect on capturing 5-10μm dust particles and has stable purification performance.

System Dimensions and Structure
Power Specifications 3 Phase, 380V/50Hz, Customizable
Power 4KW
Air Volume 3000m³/h
System Air Pressure 3300Pa
Filtration Accuracy 5-10μm
Water Consumption Around 3.5L/h
Material Carbon steel, powder coated, customizable
Primary Filtration Wet settling Filter
Secondary Filtration Metal filter
Dimensions 1203mm*900mm*2650mm
Installation Overview
Workshop Installation 1
Workshop Installation 2
Additional System Integration
Component Detail 1
Component Detail 2
Component Detail 3
Quality Process 1
Quality Process 2
Quality Process 3
Factory Testing 1
Factory Testing 2
Factory Testing 3
Certificates and Checks 1
Certificates and Checks 2
Certificates and Checks 3
Final Product Showcase
Frequently Asked Questions
Q: Can you recommend me a suitable type?

Sure, we will provide you with suitable solutions and products according your conditions and requirements.

Q: How is your delivery time?

It usually takes about 7 days after receiving the advance payment. But the specific delivery time depends on the order quantity.

Q: Do you offer custom-made products?

Yes, we can manufacture moulds and fixing devices according to your samples or technical drawings.

Q: Have you tested all your goods before delivery?

Yes, we have 100% test before delivery and provide you with video proof.

Q: How should I install it?

We will provide relevant video installation tutorials. In case of necessity, we will send professionals to carry out the installation.

Q: Is there an after-sales warranty?

Yeah. The warranty period is one year, and maintenance is free during the warranty period.

Related Products